JavaScript and Cookies are required to view this site. Please enable both in your browser settings.
126-tonne Wind Turbine Hub and Blades Dropped Offshore
Documenting Reality Caught on Camera Catastrophic Failure & Destruction 126-tonne Wind Turbine Hub and Blades Dropped Offshore

126-tonne Wind Turbine Hub and Blades Dropped Offshore

Current Rating:
Unlimited Views No Ads No Algorithms Lifetime Account

Documenting Reality

Community Forum · Est. 2006

Join Now
Tools ▾
  #1  
● 10-23-2021, 03:46 AM
chris's Avatar
chris
Offline: Offline
★ ★ GENERAL ★ ★
Poster Rank:37
male
Join Date: Oct 2006
Posts: 42,267
Contributions: 36
Joined Oct 2006·Rank #37
 
42,267Posts
101,599Thanked
21,270Quoted
2,278Mentioned
36Contrib.
126-tonne Wind Turbine Hub and Blades Dropped Offshore

A 126-tonne offshore wind turbine hub and blade assembly was dropped into the water on October 21, 2021.
Click here to remove ›
4.52 MB ·6 views DownloadMember
__________________
Support the site and our continued existance by upgrading to a Green Name
▼ PROMO FROM DOCUMENTING REALITY
Not what you expected? Here You know.
Join Now
Hidden for upgraded members.
Documenting Reality Caught on Camera Catastrophic Failure & Destruction 126-tonne Wind Turbine Hub and Blades Dropped Offshore
Documenting Reality Caught on Camera Catastrophic Failure & Destruction 126-tonne Wind Turbine Hub and Blades Dropped Offshore


Powered by vBulletin Copyright 2000-2010 Jelsoft Enterprises Limited.

Search Engine Friendly URLs by vBSEO